{"id":547,"date":"2022-12-05T02:37:08","date_gmt":"2022-12-05T02:37:08","guid":{"rendered":"https:\/\/www.eagleroofindonesia.com\/portfolio\/"},"modified":"2022-12-05T08:10:20","modified_gmt":"2022-12-05T08:10:20","slug":"portfolio","status":"publish","type":"page","link":"https:\/\/www.eagleroofindonesia.com\/en\/portfolio\/","title":{"rendered":"PORTFOLIO"},"content":{"rendered":"\n<table id=\"tablepress-2\" class=\"tablepress tablepress-id-2\">\n<thead>\n<tr class=\"row-1\">\n\t<th class=\"column-1\">No<\/th><th class=\"column-2\">Name of Project &amp; Location <\/th><th class=\"column-3\">Main Contractor <\/th><th class=\"column-4\">Priod<\/th><th class=\"column-5\">Type Of Roof\/Siding &amp; Volume<\/th><th class=\"column-6\">Remark<\/th>\n<\/tr>\n<\/thead>\n<tbody class=\"row-striping row-hover\">\n<tr class=\"row-2\">\n\t<td class=\"column-1\">1<\/td><td class=\"column-2\">Iseki New Factory Pier - Pasuruan<\/td><td class=\"column-3\">PT. INDONAKANO<\/td><td class=\"column-4\">April 2013<\/td><td class=\"column-5\">Eagle-ZIP 420 Al-Zinc = 22.000 m2<br \/>\nEagle Trim PP Al-Zinc = 2.000 m2<\/td><td class=\"column-6\">Roll on Site <\/td>\n<\/tr>\n<tr class=\"row-3\">\n\t<td class=\"column-1\">2<\/td><td class=\"column-2\">Seiren New Fa ctory JABABEKA VI - Cikarang <\/td><td class=\"column-3\">PT. INDONAKANO <\/td><td class=\"column-4\">May 2013 <\/td><td class=\"column-5\">Eagle-Zip 420 Al-Zinc = 15.000 m2<br \/>\nEagle Trim PP Al-Zinc = 2.000 m2<\/td><td class=\"column-6\">Roll on Site <\/td>\n<\/tr>\n<tr class=\"row-4\">\n\t<td class=\"column-1\">3<\/td><td class=\"column-2\">Fusoh Tube Parts Indonesia JABABEKA VI - Cikarang <\/td><td class=\"column-3\">PT. Polygon Perkasa Indonesia <\/td><td class=\"column-4\">April 2013 <\/td><td class=\"column-5\">Eagle-Zip 428 Al-Zinc = 3.500 m2 <br \/>\nEagle Trim PP Al-Zinc= 800 m' <\/td><td class=\"column-6\">Roll on Site <\/td>\n<\/tr>\n<tr class=\"row-5\">\n\t<td class=\"column-1\">4<\/td><td class=\"column-2\">KTB New Sparepart Center MM2100 - Cibitung, Bekasi <\/td><td class=\"column-3\">PT. SMCC Utama Indonesia <\/td><td class=\"column-4\">August 2013 <\/td><td class=\"column-5\">Eagle-Zip 428 Al-Zinc = 32.000 m2 <br \/>\nEagle Trim PP Al-Zinc = 8.000 m2<\/td><td class=\"column-6\">Roll on Site <\/td>\n<\/tr>\n<tr class=\"row-6\">\n\t<td class=\"column-1\">5<\/td><td class=\"column-2\">Yamakin Indonesia MM2100 - Cibitung, Bekasi <\/td><td class=\"column-3\">PT. KADI International <\/td><td class=\"column-4\">July 2013 <\/td><td class=\"column-5\">Eagle-Zip 428 Al-Zinc = 3.500 m2 <br \/>\nEagle Trim PP Al-Zinc = 1.400 m2<\/td><td class=\"column-6\">-<\/td>\n<\/tr>\n<tr class=\"row-7\">\n\t<td class=\"column-1\">6<\/td><td class=\"column-2\">Sankyu Logisti c Center Deltamas - Cikarang <\/td><td class=\"column-3\">PT. SMCC Utama Indonesia <\/td><td class=\"column-4\">June 2013 <\/td><td class=\"column-5\">Eagle-Zip 428 Al-Zinc = 17 .000 m2 <br \/>\nEagle Trim PP Al-Zinc= 6.000 m2<\/td><td class=\"column-6\">Roll on Site <\/td>\n<\/tr>\n<tr class=\"row-8\">\n\t<td class=\"column-1\">7<\/td><td class=\"column-2\">Brite Polymer JABABEKA I - Cikarang <\/td><td class=\"column-3\">PT. Prima Engineering Constru ction <\/td><td class=\"column-4\">July 2013 <\/td><td class=\"column-5\">Eagle Rib PP Al-Zinc = 5.000 m2 <br \/>\nEagle Trim PP Al-Zinc = 2.000 m2 <\/td><td class=\"column-6\">-<\/td>\n<\/tr>\n<tr class=\"row-9\">\n\t<td class=\"column-1\">8<\/td><td class=\"column-2\">TS-T ech <br \/>\nBIC - Cikampek <\/td><td class=\"column-3\">PT. SMCC Utama Indonesia <\/td><td class=\"column-4\">October 2013<\/td><td class=\"column-5\">Eagle-Zip 428 Al-Zinc = 6.500 m2 <br \/>\nEagle Trim PP Al-Zinc = 500 m2 <\/td><td class=\"column-6\">Roll on Site <\/td>\n<\/tr>\n<tr class=\"row-10\">\n\t<td class=\"column-1\">9<\/td><td class=\"column-2\">Tigar 50 TPD <br \/>\nPupuk Kujang - Cikampek <\/td><td class=\"column-3\">PT. SMCC Utama Indonesia <\/td><td class=\"column-4\">September 2013<\/td><td class=\"column-5\">Eagle-Zip 428 PP Al-Zinc = 2.100 m2 <br \/>\nEagle Trim PP Al-Zinc = 3.100 m2<\/td><td class=\"column-6\">Roll on Site <\/td>\n<\/tr>\n<tr class=\"row-11\">\n\t<td class=\"column-1\">10<\/td><td class=\"column-2\">YEMI Factory II Extension PIER - Pasuruan <\/td><td class=\"column-3\">PT. INDONAKANO <\/td><td class=\"column-4\">November 2013<\/td><td class=\"column-5\">Eagle-Zip 420 Al-Zinc = 1.300 m2 <br \/>\nEagle Trim PP Al-Zinc = 1.600 m2<\/td><td class=\"column-6\">Roll on Site <\/td>\n<\/tr>\n<tr class=\"row-12\">\n\t<td class=\"column-1\">11<\/td><td class=\"column-2\">YMPI Factory II <br \/>\nPIER - Pasuruan <\/td><td class=\"column-3\">PT. INDONAKANO <\/td><td class=\"column-4\">November 2013<\/td><td class=\"column-5\">Eagle-Zip 420 Al-Zinc = 5.000 m2 <br \/>\nEagle Trim PP Al-Zinc= 1.100 m2 <\/td><td class=\"column-6\">Roll on Site <\/td>\n<\/tr>\n<tr class=\"row-13\">\n\t<td class=\"column-1\">12<\/td><td class=\"column-2\">SUDO Manufacturing MM2100 - Cibilung, Bekasi <\/td><td class=\"column-3\">PT. INDONAKANO <\/td><td class=\"column-4\">January 2014<\/td><td class=\"column-5\">Eagle-Zip 428 Al-Zinc = 3. 700 m2 <br \/>\nEagle Trim PP Al-Zinc = 1.600 m2<\/td><td class=\"column-6\">Roll on Site <\/td>\n<\/tr>\n<tr class=\"row-14\">\n\t<td class=\"column-1\">13<\/td><td class=\"column-2\">Jfe Shoji Steel Indonesia MM2100 - Cikarang, Bekasi <\/td><td class=\"column-3\">PT. KADI International <\/td><td class=\"column-4\">February 2014<\/td><td class=\"column-5\">Eagle Trim PP Al-Zinc= 4.500 m2<\/td><td class=\"column-6\">-<\/td>\n<\/tr>\n<tr class=\"row-15\">\n\t<td class=\"column-1\">14<\/td><td class=\"column-2\">Boltz Indonesia KIIC - Ka raw a ng <\/td><td class=\"column-3\">PT. INDONAKANO <\/td><td class=\"column-4\">March 2014 <\/td><td class=\"column-5\">Eagle-Zip 428 Al-Zinc = 5.100 m2 <br \/>\nEagle Trim PP Al-Zinc = 2.400 m2 <\/td><td class=\"column-6\">Roll on Site <\/td>\n<\/tr>\n<tr class=\"row-16\">\n\t<td class=\"column-1\">15<\/td><td class=\"column-2\">Su ca co <br \/>\nSerang - Balaraja Baral <\/td><td class=\"column-3\">PT. Hanada Eka Perkasa <\/td><td class=\"column-4\">March 2014 <\/td><td class=\"column-5\">Eagle-Zip 428 Al-Zinc = 8.400 m2 <br \/>\nEagle Trim PP Al-Zinc = 1.300 m2<\/td><td class=\"column-6\">-<\/td>\n<\/tr>\n<tr class=\"row-17\">\n\t<td class=\"column-1\">16<\/td><td class=\"column-2\">Ito chu Logisti c Corp. Surya Cipta - Karawang <\/td><td class=\"column-3\">PT. INDONAKANO <\/td><td class=\"column-4\">June 2014 <\/td><td class=\"column-5\">Eagle-Zip 428 Al-Zinc = 9.700 m2 <br \/>\nEagle Trim PP Al-Zinc = 4.700 m2 <\/td><td class=\"column-6\">Roll on Site <\/td>\n<\/tr>\n<tr class=\"row-18\">\n\t<td class=\"column-1\">17<\/td><td class=\"column-2\">Dowa Thermotech Indonesia Kl IC - Karawang Ba rat <\/td><td class=\"column-3\">PT. INDONAKANO <\/td><td class=\"column-4\">June 2014 <\/td><td class=\"column-5\">Eagle-Zip 428 Al-Zinc = 4.000 m2 <br \/>\nEagle Trim PP Al-Zinc = 1.500 m2<\/td><td class=\"column-6\">Roll on Site <\/td>\n<\/tr>\n<tr class=\"row-19\">\n\t<td class=\"column-1\">18<\/td><td class=\"column-2\">Taiyo Tosin Indonesia MM2100 - Cikarang <\/td><td class=\"column-3\">PT. KADI International <\/td><td class=\"column-4\">July 2014 <\/td><td class=\"column-5\">Eagle-Zip 428 Al-Zinc = 1.500 m2 <br \/>\nEagle Trim PP Al-Zinc = 500 m2 <\/td><td class=\"column-6\">-<\/td>\n<\/tr>\n<tr class=\"row-20\">\n\t<td class=\"column-1\">19<\/td><td class=\"column-2\">Hisada Indonesia MM2100 - Cibitung <\/td><td class=\"column-3\">PT. KADI International <\/td><td class=\"column-4\">October 2014<\/td><td class=\"column-5\">Eagle Trim PP Al-Zinc= 2.300 m2<\/td><td class=\"column-6\">-<\/td>\n<\/tr>\n<tr class=\"row-21\">\n\t<td class=\"column-1\">20<\/td><td class=\"column-2\">Nippon Konpo (Extension) KIM - Karawang <\/td><td class=\"column-3\">PT. PP-Taisei Indonesia <\/td><td class=\"column-4\">February 2015<\/td><td class=\"column-5\">Eagle-Zip 420 Al-Zinc = 7 .000 m2<\/td><td class=\"column-6\">Roll on Site <\/td>\n<\/tr>\n<tr class=\"row-22\">\n\t<td class=\"column-1\">21<\/td><td class=\"column-2\">Kanefusa Indonesia Delta Sili con - Cikarang <\/td><td class=\"column-3\">PT. INDONAKANO <\/td><td class=\"column-4\">March 2015 <\/td><td class=\"column-5\">Eagle-Zip 428 Al-Zinc= 5.000 m2 <br \/>\nEagle Trim PP Al-Zinc= 500 m2<\/td><td class=\"column-6\">Roll on Site <\/td>\n<\/tr>\n<tr class=\"row-23\">\n\t<td class=\"column-1\">22<\/td><td class=\"column-2\">NEX Logisti c Indonesia Deltamas - Cikarang <\/td><td class=\"column-3\">PT. SMCC Utama Indonesia <\/td><td class=\"column-4\">March 2015 <\/td><td class=\"column-5\">Eagle-Zip 428 Al-Zinc= 15.500 m2 <br \/>\nEagle Trim PP Al-Zinc = 5.800 m2<\/td><td class=\"column-6\">Roll on Site <\/td>\n<\/tr>\n<tr class=\"row-24\">\n\t<td class=\"column-1\">23<\/td><td class=\"column-2\">Nippon Konpo Indonesia Kota Bukit lndah - Cikampek <\/td><td class=\"column-3\">PT. PP-Taisei Indonesia <\/td><td class=\"column-4\">March 2015 <\/td><td class=\"column-5\">Eagle-Zip 420 Al-Zinc = 11.000 m2<br \/>\nEagle Trim PP Al-Zinc = 3.300 m2 <br \/>\n<\/td><td class=\"column-6\">Roll on Site <\/td>\n<\/tr>\n<tr class=\"row-25\">\n\t<td class=\"column-1\">24<\/td><td class=\"column-2\">Sankyu (Phase II) Deltamas - Cikarang <\/td><td class=\"column-3\">PT. SMCC Utama Indonesia <\/td><td class=\"column-4\">May 2015 <\/td><td class=\"column-5\">Eagle-Zip 428 Al-Zinc= 20.000 m2<br \/>\nEagle Trim PP Al-Zinc = 9.300 m2 <br \/>\n<\/td><td class=\"column-6\">Roll on Site <\/td>\n<\/tr>\n<tr class=\"row-26\">\n\t<td class=\"column-1\">25<\/td><td class=\"column-2\">Nittsu Shoji <br \/>\nKIM - Karawang <\/td><td class=\"column-3\">PT. SMCC Utama Indonesia <\/td><td class=\"column-4\">May 2015 <\/td><td class=\"column-5\">Eagle-Zip 420 Al-Zinc= 30.000 m2 <br \/>\nEagle Trim PP Al-Zinc = 9.200 m2 <br \/>\n<\/td><td class=\"column-6\">Roll on Site <\/td>\n<\/tr>\n<tr class=\"row-27\">\n\t<td class=\"column-1\">26<\/td><td class=\"column-2\">Meiji Rubber Indonesia Deltamas - Cikarang <\/td><td class=\"column-3\">PT. INDONAKANO <\/td><td class=\"column-4\">May 2015 <\/td><td class=\"column-5\">Eagle-Zip 420 Al-Zinc= 30.000 m2 <br \/>\nEagle Trim PP Al-Zinc = 9.200 m2 <br \/>\n<\/td><td class=\"column-6\">Roll on Site <\/td>\n<\/tr>\n<tr class=\"row-28\">\n\t<td class=\"column-1\">27<\/td><td class=\"column-2\">Hankyu Hanshin Logistics MM2100 - Cibitung <\/td><td class=\"column-3\">PT. INDONAKANO <\/td><td class=\"column-4\">May 2015 <\/td><td class=\"column-5\">Eagle-Zip 750 Al-Zinc= 10.200 m2 <br \/>\nEagle Trim PP Al-Zinc= 1.500 m2 <br \/>\n<\/td><td class=\"column-6\">Roll on Site <\/td>\n<\/tr>\n<tr class=\"row-29\">\n\t<td class=\"column-1\">28<\/td><td class=\"column-2\">Ajinomoto Coal Boiler Mojokerto - East Java <\/td><td class=\"column-3\">PT. INDONAKANO <\/td><td class=\"column-4\">June 2015 <\/td><td class=\"column-5\">Eagle-Zip 750 Al-Zinc = 6.000 m2 <br \/>\nEagle Trim PP Al-Zinc = 3.000 m2 <br \/>\n<\/td><td class=\"column-6\">Roll on Site <\/td>\n<\/tr>\n<tr class=\"row-30\">\n\t<td class=\"column-1\">29<\/td><td class=\"column-2\">Tsuzuki Asama (Extension) KIIC - Karawang <\/td><td class=\"column-3\">PT. INDONAKANO <\/td><td class=\"column-4\">October 2015<\/td><td class=\"column-5\">Eagle Clip 600-BL Al-Zinc = 7.000 m2 <br \/>\n<\/td><td class=\"column-6\">Roll on Site <\/td>\n<\/tr>\n<tr class=\"row-31\">\n\t<td class=\"column-1\">30<\/td><td class=\"column-2\">Toyo Denso (Phase Ill) MM2100 - Cibitung <\/td><td class=\"column-3\">PT. SMCC Utama Indonesia <\/td><td class=\"column-4\">December 2015<\/td><td class=\"column-5\">Eagle-Zip 750 Al-Zinc = 3.500 m2 <br \/>\nEagle Trim PP Al-Zinc = 500 m2 <br \/>\n<\/td><td class=\"column-6\">Roll on Site <\/td>\n<\/tr>\n<tr class=\"row-32\">\n\t<td class=\"column-1\">31<\/td><td class=\"column-2\">Tenma Indonesia <br \/>\nSurya Cipta - Karawang <\/td><td class=\"column-3\">PT. SMCC Utama Indonesia <\/td><td class=\"column-4\">February 2015<\/td><td class=\"column-5\">Eagle-Zip 750 Al-Zinc = 25.000 m2 <br \/>\nEagle Trim PP Al-Zinc= 5.000 m2 <br \/>\n<\/td><td class=\"column-6\">Roll on Site <\/td>\n<\/tr>\n<tr class=\"row-33\">\n\t<td class=\"column-1\">32<\/td><td class=\"column-2\">PPLI Maintenance Cileungsi - Boger <\/td><td class=\"column-3\">PT. INDONAKANO <\/td><td class=\"column-4\">February 2015<\/td><td class=\"column-5\">Eagle-Zip 750 Al-Zinc = 4.000 m2 <br \/>\nEagle Trim PP Al-Zinc = 2.200 m2 <br \/>\n<\/td><td class=\"column-6\">Roll on Site <\/td>\n<\/tr>\n<tr class=\"row-34\">\n\t<td class=\"column-1\">33<\/td><td class=\"column-2\">JFE Shoji Steel (Extension) MM2100 - Cibitung <\/td><td class=\"column-3\">PT. INDONAKANO <\/td><td class=\"column-4\">March 2016 <\/td><td class=\"column-5\">Eagle Clip 600-BL A\udbc0\udc24Zinc = 3.000 m2 <br \/>\nEagle Trim PP Al-Zinc = 2.000 m2 <br \/>\n<\/td><td class=\"column-6\">Roll on Site <\/td>\n<\/tr>\n<tr class=\"row-35\">\n\t<td class=\"column-1\">34<\/td><td class=\"column-2\">Hoyu Indonesia <br \/>\nKIIC - Karawang <\/td><td class=\"column-3\">PT. SMCC Utama Indonesia <\/td><td class=\"column-4\">June 2016 <\/td><td class=\"column-5\">Eagle-Zip 750 Al-Zinc = 12.000 m2 <br \/>\nEagle Trim PP Al-Zinc= 1.800 m2<br \/>\n<\/td><td class=\"column-6\">Roll on Site <\/td>\n<\/tr>\n<tr class=\"row-36\">\n\t<td class=\"column-1\">35<\/td><td class=\"column-2\">Denso Indonesia (Plant 3) MM2100 - Cikarang <\/td><td class=\"column-3\">PT. PP-Taisei Indonesia <\/td><td class=\"column-4\">August 2016 <\/td><td class=\"column-5\">Eagle-Zip 750 Al-Zinc = 12.000 m2 <br \/>\nEagle Trim PP Al-Zinc = 3.800 m2<br \/>\n<\/td><td class=\"column-6\">Roll on Site <\/td>\n<\/tr>\n<tr class=\"row-37\">\n\t<td class=\"column-1\">36<\/td><td class=\"column-2\">Sajiku Ajinomoto <br \/>\nKIIC - Karawang <\/td><td class=\"column-3\">PT. PP-Taisei Indonesia <\/td><td class=\"column-4\">December 2016<\/td><td class=\"column-5\">Eagle-Zip 750 Al-Zinc = 6.000 m2<br \/>\nEagle Trim PP Al-Zinc= 2.200 m2 <br \/>\n<\/td><td class=\"column-6\">Roll on Site <\/td>\n<\/tr>\n<tr class=\"row-38\">\n\t<td class=\"column-1\">37<\/td><td class=\"column-2\">Maxxis Build. 105 -108 Deltamas - Cikarang <\/td><td class=\"column-3\">PT. SMCC Utama Indonesia <\/td><td class=\"column-4\">December 2016<\/td><td class=\"column-5\">Eagle-Zip 420 PP Al-Zinc = 36.000 m2 <br \/>\nEagle Trim PP Al-Zinc = 60.000 m2 <br \/>\n<\/td><td class=\"column-6\">Roll on Site <\/td>\n<\/tr>\n<tr class=\"row-39\">\n\t<td class=\"column-1\">38<\/td><td class=\"column-2\">Nissin Foods Indonesia Jababeka - Cikarang <\/td><td class=\"column-3\">PT. SMCC Utama Indonesia <\/td><td class=\"column-4\">April 2017 <\/td><td class=\"column-5\">Eagle-Zip 750 Al-Zinc = 7.000 m2 <br \/>\n<\/td><td class=\"column-6\">Roll on Site <\/td>\n<\/tr>\n<tr class=\"row-40\">\n\t<td class=\"column-1\">39<\/td><td class=\"column-2\">E-0 Sajiku Indonesia <br \/>\nKIIC - Karawang<\/td><td class=\"column-3\">PT. PP-Taisei Indonesia <\/td><td class=\"column-4\">April 2017 <\/td><td class=\"column-5\">Eagle-Zip 750 Al-Zinc = 6.700 m2 <br \/>\nEagle Trim PP Al-Zinc= 2.000 m2 <br \/>\n<\/td><td class=\"column-6\">Roll on Site <\/td>\n<\/tr>\n<tr class=\"row-41\">\n\t<td class=\"column-1\">40<\/td><td class=\"column-2\">Sakura Java (Extension) EJIP - Cikarang <\/td><td class=\"column-3\">PT. INDONAKANO <\/td><td class=\"column-4\">September 2017<\/td><td class=\"column-5\">Eagle-Zip 750 Al-Zinc = 4.500 m2 <br \/>\nEagle Trim PP Al-Zinc= 800 m2<br \/>\n<\/td><td class=\"column-6\">Roll on Site <\/td>\n<\/tr>\n<tr class=\"row-42\">\n\t<td class=\"column-1\">41<\/td><td class=\"column-2\">Itochu Logistic <br \/>\nSuryacipta - Karawang <\/td><td class=\"column-3\">PT. INDONAKANO <\/td><td class=\"column-4\">October 2017<\/td><td class=\"column-5\">Eagle-Zip 428 Al-Zinc = 8.000 m2 <br \/>\nEagle Trim PP Al-Zinc= 4.000 m2 <br \/>\n<\/td><td class=\"column-6\">Roll on Site <\/td>\n<\/tr>\n<tr class=\"row-43\">\n\t<td class=\"column-1\">42<\/td><td class=\"column-2\">Hiruta Kogyo (Extension) KIIC - Karawang <\/td><td class=\"column-3\">PT. INDONAKANO <\/td><td class=\"column-4\">December 2017<\/td><td class=\"column-5\">Eagle-Zip 750 Al-Zinc = 2.000 m2 <br \/>\nEagle Trim PP Al-Zinc= 1.000 m2 <br \/>\n<\/td><td class=\"column-6\">Roll on Site <\/td>\n<\/tr>\n<tr class=\"row-44\">\n\t<td class=\"column-1\">43<\/td><td class=\"column-2\">Ajinomoto Re-Building Printing Mojokerto - East Java <\/td><td class=\"column-3\">PT. INDONAKANO <\/td><td class=\"column-4\">December 2017<\/td><td class=\"column-5\">Eagle-Zip 750 Al-Zinc = 3.000 m2 <br \/>\nEagle Trim PP Al-Zinc = 500 m2 <br \/>\n<\/td><td class=\"column-6\">Roll on Site <\/td>\n<\/tr>\n<tr class=\"row-45\">\n\t<td class=\"column-1\">44<\/td><td class=\"column-2\">Yamada 2nd Factory Extension MM2100 - Cibitung <\/td><td class=\"column-3\">PT. INDONAKANO <\/td><td class=\"column-4\">February 2018<\/td><td class=\"column-5\">Eagle-Zip 750 Al-Zinc = 5.000 m2<\/td><td class=\"column-6\">Roll on Site <\/td>\n<\/tr>\n<tr class=\"row-46\">\n\t<td class=\"column-1\">45<\/td><td class=\"column-2\">lseki Factory Extension PIER - Pasuruan <\/td><td class=\"column-3\">PT. INDONAKANO <\/td><td class=\"column-4\">March 2018 <\/td><td class=\"column-5\">Eagle-Zip 420 Al-Zinc = 8.000 m2 <br \/>\nEagle Trim PP Al-Zinc = 1.000 m2<\/td><td class=\"column-6\">Roll on Site <\/td>\n<\/tr>\n<tr class=\"row-47\">\n\t<td class=\"column-1\">46<\/td><td class=\"column-2\">Schutz New Factory KIIC - Karawang <br \/>\n<\/td><td class=\"column-3\">PT. INDONAKANO <\/td><td class=\"column-4\">July 2018 <\/td><td class=\"column-5\">Eagle-Zip 750 PP Al-Zinc= 8.500 m2 <br \/>\nEagle Trim PP Al-Zinc = 18.000 m2<br \/>\n<\/td><td class=\"column-6\">Roll on Site <\/td>\n<\/tr>\n<tr class=\"row-48\">\n\t<td class=\"column-1\">47<\/td><td class=\"column-2\">Nex Log isti cs Indonesi a GIIC - Cikarang <br \/>\n<\/td><td class=\"column-3\">PT. SMCC Utama Indonesia <\/td><td class=\"column-4\">July 2018 <\/td><td class=\"column-5\">Eagle-Zip 750 Al-Zinc = 46.200 m2<br \/>\nEagle Trim PP Al-Zinc= 10.800 m2<\/td><td class=\"column-6\">Roll on Site <\/td>\n<\/tr>\n<tr class=\"row-49\">\n\t<td class=\"column-1\">48<\/td><td class=\"column-2\">lnoac PU Factory Karawang - West Java <\/td><td class=\"column-3\">PT. INDONAKANO <\/td><td class=\"column-4\">September 2018<\/td><td class=\"column-5\">Eagle-Zip 750 Al-Zinc = 3.500 m2 <br \/>\nEagle Trim PP Al-Zinc= 2.800 m2<\/td><td class=\"column-6\">Roll on Site <\/td>\n<\/tr>\n<tr class=\"row-50\">\n\t<td class=\"column-1\">49<\/td><td class=\"column-2\">Nutrindo Joga Shima Delta Mas - Cikarang Denso 3 Expansi on WH MM2100 - Cikarang <\/td><td class=\"column-3\">PT. Taisei- Pulauintan Construction Internati onal <\/td><td class=\"column-4\">October 2018<\/td><td class=\"column-5\">Eagle-Zip 750 Al-Zinc = 3.000 m2 <br \/>\nEagle Trim PP Al-Zinc= 2.000 m2<\/td><td class=\"column-6\">Roll on Site <\/td>\n<\/tr>\n<tr class=\"row-51\">\n\t<td class=\"column-1\">50<\/td><td class=\"column-2\">Denso 3 Expansi on WH MM2100 - Cikarang <\/td><td class=\"column-3\">PT. Taisei- Pulauintan Construction Internati onal <\/td><td class=\"column-4\">November 2018<\/td><td class=\"column-5\">Eagle-Zip 750 Al-Zinc = 7.500 m2 <br \/>\nEagle Trim PP Al-Zinc= 2.000 m2<\/td><td class=\"column-6\">Roll on Site <\/td>\n<\/tr>\n<tr class=\"row-52\">\n\t<td class=\"column-1\">51<\/td><td class=\"column-2\">Kao Indonesia <br \/>\nJababeka - Cikarang <\/td><td class=\"column-3\">PT. Eskon Bangun Lestari <\/td><td class=\"column-4\">December 2018<\/td><td class=\"column-5\">Eagle Clip 600-BL Al-Zinc = 2.000 m2 <br \/>\nEagle Trim Al-Zinc : 1.200 m2<\/td><td class=\"column-6\">Roll on Site <\/td>\n<\/tr>\n<tr class=\"row-53\">\n\t<td class=\"column-1\">52<\/td><td class=\"column-2\">ITSA Factory Expansi on KIIC - Karawang <br \/>\n<\/td><td class=\"column-3\">PT. INDONAKANO <\/td><td class=\"column-4\">January 2019<\/td><td class=\"column-5\">Eagle Clip 600-BL Al-Zinc = 7.000 m2<br \/>\nEagle Trim PP Al-Zinc = 5.000 m2<\/td><td class=\"column-6\">Roll on Site <\/td>\n<\/tr>\n<tr class=\"row-54\">\n\t<td class=\"column-1\">53<\/td><td class=\"column-2\">SMII Finished Goods Pulogadung - Jakarta <\/td><td class=\"column-3\">PT. INDONAKANO <\/td><td class=\"column-4\">May 2019 <\/td><td class=\"column-5\">Eagle-Zip 750 Al-Zinc : 3.500 m2<br \/>\nEagle Trim PP Al-Zinc = 3.000 m2<\/td><td class=\"column-6\">-<\/td>\n<\/tr>\n<tr class=\"row-55\">\n\t<td class=\"column-1\">54<\/td><td class=\"column-2\">HATTORY Factory Renovation Majalaya - Bandung <\/td><td class=\"column-3\">PT. KADI Internati onal <\/td><td class=\"column-4\">June 2019 <\/td><td class=\"column-5\">Eagle-Zip 750 Al-Zinc = 6.700 m2 <br \/>\nEagle Trim PP Al-Zinc = 2.700 m2 <br \/>\n<\/td><td class=\"column-6\">Roll on Site <\/td>\n<\/tr>\n<tr class=\"row-56\">\n\t<td class=\"column-1\">55<\/td><td class=\"column-2\">Asahimas Chemical <br \/>\nCilegon - Banten <\/td><td class=\"column-3\">PT. SMCC Utama Indonesia <\/td><td class=\"column-4\">July 2019 <\/td><td class=\"column-5\">Eagle-Zip 750 Al-Zinc = 2.200 m2 <br \/>\nEagle Trim PP Al-Zinc = 1.500 m1 <br \/>\n<\/td><td class=\"column-6\">Roll on Site <\/td>\n<\/tr>\n<tr class=\"row-57\">\n\t<td class=\"column-1\">56<\/td><td class=\"column-2\">PPLI PCB Treatment Facilities Cileungsi - Bogor <\/td><td class=\"column-3\">PT. INDONAKANO <\/td><td class=\"column-4\">July 2019 <\/td><td class=\"column-5\">Eagle-Zip 750 PP Al-Zinc = 2.600 m2<br \/>\nEagle Trim PP Al-Zinc = 1.800 m2<\/td><td class=\"column-6\">-<\/td>\n<\/tr>\n<tr class=\"row-58\">\n\t<td class=\"column-1\">57<\/td><td class=\"column-2\">RKN Forge Factory Extension KIM - Karawang <\/td><td class=\"column-3\">PT. INDONAKANO <\/td><td class=\"column-4\">August 2019<\/td><td class=\"column-5\">Eagle-Zip 750 Al-Zinc = 3.500 m2 <br \/>\nEagle Trim PP Al-Zinc = 1.500 m2 <br \/>\n<\/td><td class=\"column-6\">Roll on Site <\/td>\n<\/tr>\n<tr class=\"row-59\">\n\t<td class=\"column-1\">58<\/td><td class=\"column-2\">Hon Chuan Third Warehouse Ngoro - Mojokerto <\/td><td class=\"column-3\">PT. INDONAKANO <\/td><td class=\"column-4\">August 2019<\/td><td class=\"column-5\">Eagle-Zip 750 PP Al-Zinc= 16.000 m2<br \/>\nEagle Trim PP Al-Zinc = 5.100 m2 <br \/>\n<\/td><td class=\"column-6\">Roll on Site <\/td>\n<\/tr>\n<tr class=\"row-60\">\n\t<td class=\"column-1\">59<\/td><td class=\"column-2\">Takai Seiki Extension MM2100 - Cikarang <\/td><td class=\"column-3\">PT. INDONAKANO <\/td><td class=\"column-4\">September 2019<\/td><td class=\"column-5\">Eagle Clip 600-BL Al-Zinc = 1.200 m2<br \/>\nEagle Trim PP Al-Zinc = 1.000 m2<\/td><td class=\"column-6\">Roll on Site <\/td>\n<\/tr>\n<tr class=\"row-61\">\n\t<td class=\"column-1\">60<\/td><td class=\"column-2\">Sakae Riken Extensi on Surya Cipta - Karawang <\/td><td class=\"column-3\">PT. Taisei- Pulauintan Construction Internati onal <\/td><td class=\"column-4\">September 2019<\/td><td class=\"column-5\"> Eagle-Zip 420 Al-Zinc = 11.200 m2<br \/>\nEagle Trim PP Al-Zinc = 5.400 m2<\/td><td class=\"column-6\">Roll on Site <\/td>\n<\/tr>\n<tr class=\"row-62\">\n\t<td class=\"column-1\">61<\/td><td class=\"column-2\">Sumiden Serasi Wire Product Ci teureup - Bogor <\/td><td class=\"column-3\">PT. SMCC Utama Indonesi a <\/td><td class=\"column-4\">October 2019<\/td><td class=\"column-5\">Eagle-Zip 750 Al-Zinc = 5.300 m2 <br \/>\nEagle Trim PP Al-Zinc = 4.000 m2 <br \/>\n<\/td><td class=\"column-6\">Roll on Site <\/td>\n<\/tr>\n<tr class=\"row-63\">\n\t<td class=\"column-1\">62<\/td><td class=\"column-2\">Oriental Asahi JP Carton Box MM2100 - Cikarang <\/td><td class=\"column-3\">PT. INDONAKANO <\/td><td class=\"column-4\">October 2019<\/td><td class=\"column-5\">Eagle Clip 600-BL Al-Zinc= 35.500 m2<br \/>\nEagle Trim PP Al-Zinc = 9.200 m2 <\/td><td class=\"column-6\">Roll on Site <\/td>\n<\/tr>\n<tr class=\"row-64\">\n\t<td class=\"column-1\">63<\/td><td class=\"column-2\">Asahi Denso Extension MM2100 - Cikarang <\/td><td class=\"column-3\">PT. INDONAKANO <\/td><td class=\"column-4\">November 2019<\/td><td class=\"column-5\">Eagle Clip 600-BL Al-Zinc= 5.200 m2<br \/>\nEagle Trim PP Al-Zinc = 2.000 m2 <\/td><td class=\"column-6\">Roll on Site <\/td>\n<\/tr>\n<tr class=\"row-65\">\n\t<td class=\"column-1\">64<\/td><td class=\"column-2\">Theodore Pan Brothers <br \/>\nJati hurip - Tasikmalaya <\/td><td class=\"column-3\">PT. MET A EPSI <\/td><td class=\"column-4\">January 2020<\/td><td class=\"column-5\">Eagle-Zip 750 Al-Zinc = 20.000 m2 <\/td><td class=\"column-6\">Roll on Site <\/td>\n<\/tr>\n<tr class=\"row-66\">\n\t<td class=\"column-1\">65<\/td><td class=\"column-2\">lnoac Polytechno Indonesia Cikupa Mas - Tangerang <\/td><td class=\"column-3\">PT. Shimi zu Bangun Cipta <\/td><td class=\"column-4\">October 2020<\/td><td class=\"column-5\">Eagle-Zip 420 Al-Zinc = 19.000 m2 <br \/>\nEagle Trim Al-Zinc = 9.000 m2 <\/td><td class=\"column-6\">Roll on Site <\/td>\n<\/tr>\n<tr class=\"row-67\">\n\t<td class=\"column-1\">66<\/td><td class=\"column-2\">Nissin Food Indonesia JABABEKA - Cikarang <\/td><td class=\"column-3\">PT. INDONAKANO <\/td><td class=\"column-4\">November 2020<\/td><td class=\"column-5\">Eagle-Zip 750 Al-Zinc = 4.500 m2 <br \/>\nEagle Trim PP Al-Zinc = 4.500 m2 <\/td><td class=\"column-6\">Roll on Site <\/td>\n<\/tr>\n<tr class=\"row-68\">\n\t<td class=\"column-1\">67<\/td><td class=\"column-2\">TSP New Factory Phase-2 GIIC \u00b7 Cikarang <\/td><td class=\"column-3\">PT. INDONAKANO <\/td><td class=\"column-4\">November 2020<\/td><td class=\"column-5\">Eagle-Zip 750 Al-Zinc = 7.500 m2 <br \/>\nEagle Trim PP Al-Zinc = 4.000 m2 <\/td><td class=\"column-6\">Roll on Site <\/td>\n<\/tr>\n<tr class=\"row-69\">\n\t<td class=\"column-1\">68<\/td><td class=\"column-2\">Sukanda Djaya Cold Storage Malang \u2022 East Java<\/td><td class=\"column-3\">PT. INDONAKANO <\/td><td class=\"column-4\">January 2021<\/td><td class=\"column-5\">Eagle-Zip 750 Al-Zinc = 5.000 m2 <br \/>\nEagle Trim Al-Zinc = 5.000 m2 <\/td><td class=\"column-6\">Roll on Site <\/td>\n<\/tr>\n<tr class=\"row-70\">\n\t<td class=\"column-1\">69<\/td><td class=\"column-2\">Heinz ABC Soy Extract Karawang \u00b7 West Java<\/td><td class=\"column-3\">PT. INDONAKANO <\/td><td class=\"column-4\">March 2021 <\/td><td class=\"column-5\">Eagle-Zip 750 Al-Zinc = 7.000 m2 <br \/>\nEagle Trim Al-Zinc = 5.000 m2 <\/td><td class=\"column-6\">Roll on Site <\/td>\n<\/tr>\n<tr class=\"row-71\">\n\t<td class=\"column-1\">70<\/td><td class=\"column-2\">TUV Nord New Laboratory Cikarang - West Java<\/td><td class=\"column-3\">PT. INDONAKANO <\/td><td class=\"column-4\">May 2021 <\/td><td class=\"column-5\">Eagle Clip 669 Al-Zinc = 2.000 m2 <\/td><td class=\"column-6\">Roll on Site <\/td>\n<\/tr>\n<tr class=\"row-72\">\n\t<td class=\"column-1\">71<\/td><td class=\"column-2\">Global Kimia <br \/>\nDelta Mas - Cikarang<\/td><td class=\"column-3\">PT. Global Kimia Manufaktur Mandiri <\/td><td class=\"column-4\">July 2021 <\/td><td class=\"column-5\">Eagle-Zip 750 Al-Zinc = 6.000 m2 <br \/>\nEagle Trim PP Al-Zinc = 7.500 m2 <\/td><td class=\"column-6\">Roll on Site <\/td>\n<\/tr>\n<tr class=\"row-73\">\n\t<td class=\"column-1\">72<\/td><td class=\"column-2\">MBI Roof Replacement Batuceper - Tangerang<\/td><td class=\"column-3\">PT. INDONAKANO <\/td><td class=\"column-4\">August 2021<\/td><td class=\"column-5\">Eagle Clip 669 Al-Zinc= 12.500 m2<\/td><td class=\"column-6\">Roll on Site <\/td>\n<\/tr>\n<tr class=\"row-74\">\n\t<td class=\"column-1\">73<\/td><td class=\"column-2\">Muramoto Elektronika Indonesia EJIP \u00b7 Cikarang <\/td><td class=\"column-3\">PT. Taisei- Pulauintan Construction International <\/td><td class=\"column-4\">August 2021<\/td><td class=\"column-5\">Eagle Trim PP Al-Zinc = 3.500 m2 <\/td><td class=\"column-6\">Roll on Site <\/td>\n<\/tr>\n<tr class=\"row-75\">\n\t<td class=\"column-1\">74<\/td><td class=\"column-2\">Asian Isuzu Casting Center KIIC - Karawang <\/td><td class=\"column-3\">PT. Polygon Perkasa lndonusa <\/td><td class=\"column-4\">October 2021<\/td><td class=\"column-5\">Eagle Clip 600-BL Al-Zinc= 7.000 m'2<\/td><td class=\"column-6\">Roll on Site <\/td>\n<\/tr>\n<tr class=\"row-76\">\n\t<td class=\"column-1\">75<\/td><td class=\"column-2\">STEP Factory Phase-3 Jababeka - Bekasi <br \/>\n<\/td><td class=\"column-3\">PT. INDONAKANO <\/td><td class=\"column-4\">November 2021<\/td><td class=\"column-5\">Eagle-Zip 750 Al-Zinc = 7.200 m2 <br \/>\nEagle Trim PP Al-Zinc = 3.800 m2 <br \/>\n<\/td><td class=\"column-6\">Roll on Site <\/td>\n<\/tr>\n<tr class=\"row-77\">\n\t<td class=\"column-1\">76<\/td><td class=\"column-2\">ISEKI Warehouse Expansion PIER - Pasuruan <\/td><td class=\"column-3\">PT. INDONAKANO <\/td><td class=\"column-4\">April 2022 <\/td><td class=\"column-5\">Eagle-Zip 420 Al-Zinc = 11.000 m2 <br \/>\nEagle Trim PP Al-Zinc = 1.500 m2 <\/td><td class=\"column-6\">Roll on Site <\/td>\n<\/tr>\n<tr class=\"row-78\">\n\t<td class=\"column-1\">77<\/td><td class=\"column-2\">Tunas Alfin Factory Cikande - Banten <br \/>\n<\/td><td class=\"column-3\">PT. Tunas Alfin Tbk. <\/td><td class=\"column-4\">April 2022 <\/td><td class=\"column-5\">Eagle-Zip 750 Al-Zinc = 23.000 m2 <br \/>\nEagle Trim PP Al-Zinc = 7.000 m2 <br \/>\n<\/td><td class=\"column-6\">Roll on Site <\/td>\n<\/tr>\n<tr class=\"row-79\">\n\t<td class=\"column-1\">78<\/td><td class=\"column-2\">SEID New Factory <br \/>\nKIIC - Karawang <\/td><td class=\"column-3\">PT. INDONAKANO <\/td><td class=\"column-4\">June 2022 <\/td><td class=\"column-5\">Eagle-Zip 420 Al-Zinc = 43.000 m2 <br \/>\nEagle Trim PP Al-Zinc= 15.000 m2<\/td><td class=\"column-6\">Roll on Site <\/td>\n<\/tr>\n<tr class=\"row-80\">\n\t<td class=\"column-1\">79<\/td><td class=\"column-2\">ESR-2 KITIC <br \/>\nDelta Mas - Cikarang<\/td><td class=\"column-3\">PT. INDONAKANO <\/td><td class=\"column-4\">June 2022 <\/td><td class=\"column-5\">Eagle-Zip 750 Al-Zinc = 40.000 m2 <br \/>\nEagle Trim PP Al-Zinc= 15.000 m2<\/td><td class=\"column-6\">Roll on Site <\/td>\n<\/tr>\n<tr class=\"row-81\">\n\t<td class=\"column-1\">80<\/td><td class=\"column-2\">Senopati <br \/>\nBekasi - West Java <\/td><td class=\"column-3\">PT. Polygon Perkasa lndonusa <\/td><td class=\"column-4\">July 2022 <\/td><td class=\"column-5\">Eagle-Zip 750 Al-Zinc = 9.000 m2<\/td><td class=\"column-6\">Roll on Site <\/td>\n<\/tr>\n<tr class=\"row-82\">\n\t<td class=\"column-1\">81<\/td><td class=\"column-2\">kawai Plant-2 Factory Extension lndotaisei - Cikampek <\/td><td class=\"column-3\">PT. Taisei-Pulauintan Construction International <\/td><td class=\"column-4\">August 2022<\/td><td class=\"column-5\">Eagle-Zip 750 Al-Zinc = 3.500 m2 <br \/>\nEagle Trim PP Al-Zinc= 2.500 m2 <\/td><td class=\"column-6\">Roll on Site <\/td>\n<\/tr>\n<tr class=\"row-83\">\n\t<td class=\"column-1\">82<\/td><td class=\"column-2\">LG Electronics R&amp;D Center MM 2100 - Cibitung <\/td><td class=\"column-3\">PT. Kumgang Hyundai Indonesia <\/td><td class=\"column-4\">September 2022<\/td><td class=\"column-5\">Eagle Clip 600-BL Al-Zinc= 10.000 m2 <br \/>\nEagle Trim Al-Zinc = 10.000 m2 <\/td><td class=\"column-6\">Roll on Site <\/td>\n<\/tr>\n<tr class=\"row-84\">\n\t<td class=\"column-1\">83<\/td><td class=\"column-2\">ITSP Factory Extension<br \/>\nGIIC - Cikarang<\/td><td class=\"column-3\">PT. INDONAKANO<\/td><td class=\"column-4\">January 2023<\/td><td class=\"column-5\">Eagle-Zip 750 Al-Zinc = 4.500 m\u00b2<br \/>\nEagle Trim PP Al-Zinc = 2.000 m\u00b2<\/td><td class=\"column-6\">Roll on Site<\/td>\n<\/tr>\n<tr class=\"row-85\">\n\t<td class=\"column-1\">84<\/td><td class=\"column-2\">PHC Indonesia Renovation<br \/>\nMM 2100 Cibitung<\/td><td class=\"column-3\">PT. INDONAKANO<\/td><td class=\"column-4\">February 2023<\/td><td class=\"column-5\">Eagle-Zip 750 Al-Zinc = 12.000 m\u00b2<br \/>\nEagle Trim PP Al-Zinc = 1.000 m\u00b2<\/td><td class=\"column-6\">Roll on Site<\/td>\n<\/tr>\n<tr class=\"row-86\">\n\t<td class=\"column-1\">85<\/td><td class=\"column-2\">Crestec Indonesia Minor<br \/>\nPIER Pasuruan<\/td><td class=\"column-3\">PT. INDONAKANO<\/td><td class=\"column-4\">March 2023<\/td><td class=\"column-5\">Eagle Clip 600-BL Al-Zinc = 3.500 m\u00b2<br \/>\nEagle Trim PP Al-Zinc = 1.000 m\u00b2<\/td><td class=\"column-6\">Roll on Site<\/td>\n<\/tr>\n<tr class=\"row-87\">\n\t<td class=\"column-1\">86<\/td><td class=\"column-2\">ITSA Factory Extension<br \/>\nKIIC - Karawang<\/td><td class=\"column-3\">PT. INDONAKANO<\/td><td class=\"column-4\">April 2023<\/td><td class=\"column-5\">Eagle Clip 600-BL Al-Zinc = 4.000 m\u00b2<br \/>\nEagle Trim PP Al-Zinc = 3.000 m\u00b2<\/td><td class=\"column-6\">Roll on Site<\/td>\n<\/tr>\n<tr class=\"row-88\">\n\t<td class=\"column-1\">87<\/td><td class=\"column-2\">Mitsubishi Indonesia (MMKI)<br \/>\nGIIC - Cikarang<\/td><td class=\"column-3\">PT. Taisei-Pulauintan Construction International<\/td><td class=\"column-4\">May 2023<\/td><td class=\"column-5\">Eagle-Zip 420 Al-Zinc = 29.000 m\u00b2<br \/>\nEagle Trim Al-Zinc = 9.000 m\u00b2<\/td><td class=\"column-6\">Roll on Site<\/td>\n<\/tr>\n<tr class=\"row-89\">\n\t<td class=\"column-1\">88<\/td><td class=\"column-2\">Freeport Manyar Smelter<br \/>\nJIIPE - Gresik<\/td><td class=\"column-3\">PT. SMCC Utama Indonesia<\/td><td class=\"column-4\">June 2023<\/td><td class=\"column-5\">Eagle Clip 600-BL PP Al-Zinc = 12.000 m\u00b2<br \/>\nEagle Trim PP Al-Zinc = 6.000 m\u00b2<\/td><td class=\"column-6\">Roll on Site<\/td>\n<\/tr>\n<tr class=\"row-90\">\n\t<td class=\"column-1\">89<\/td><td class=\"column-2\">Hitachi Astemo (Building A)<br \/>\nJababeka Cikarang<\/td><td class=\"column-3\">PT. INDONAKANO<\/td><td class=\"column-4\">July 2023<\/td><td class=\"column-5\">Eagle-Zip 750 Al-Zinc = 5.000 m\u00b2<\/td><td class=\"column-6\">Roll on Site<\/td>\n<\/tr>\n<tr class=\"row-91\">\n\t<td class=\"column-1\">90<\/td><td class=\"column-2\">ETSI Service Center<br \/>\nSuryacipta Karawang<\/td><td class=\"column-3\">PT. INDONAKANO<\/td><td class=\"column-4\">August 2023<\/td><td class=\"column-5\">Eagle-Zip 750 Al-Zinc = 6.500 m\u00b2<br \/>\nEagle Trim PP Al-Zinc = 2.000 m\u00b2<\/td><td class=\"column-6\">Roll on Site<\/td>\n<\/tr>\n<tr class=\"row-92\">\n\t<td class=\"column-1\">91<\/td><td class=\"column-2\">PHC Indonesia<br \/>\nMM2100 Cibitung<\/td><td class=\"column-3\">PT. INDONAKANO<\/td><td class=\"column-4\">December 2023<\/td><td class=\"column-5\">Eagle-Zip 750 Al-Zinc = 5.500 m\u00b2<\/td><td class=\"column-6\">Roll on Site<\/td>\n<\/tr>\n<tr class=\"row-93\">\n\t<td class=\"column-1\">92<\/td><td class=\"column-2\">ESR 3 Logistic Park 1<br \/>\nSuryacipta Karawang<\/td><td class=\"column-3\">PT. INDONAKANO<\/td><td class=\"column-4\">January 2024<\/td><td class=\"column-5\">Eagle-Zip 750 Al-Zinc = 85.000 m\u00b2<br \/>\nEagle Trim Al-Zinc = 35.000 m\u00b2<\/td><td class=\"column-6\">Roll on Site<\/td>\n<\/tr>\n<tr class=\"row-94\">\n\t<td class=\"column-1\">93<\/td><td class=\"column-2\">Narumi New Factory<br \/>\nGIIC - Cikarang<\/td><td class=\"column-3\">PT. INDONAKANO<\/td><td class=\"column-4\">March 2024<\/td><td class=\"column-5\">Eagle-Zip 750 Al-Zinc = 7.500 m\u00b2<br \/>\nEagle Trim Al-Zinc = 4.000 m\u00b2<\/td><td class=\"column-6\">Roll on Site<\/td>\n<\/tr>\n<tr class=\"row-95\">\n\t<td class=\"column-1\">94<\/td><td class=\"column-2\">Nippon Konpo Indonesia<br \/>\nGIIC - Cikarang<\/td><td class=\"column-3\">PT. SMCC Utama Indonesia<\/td><td class=\"column-4\">May 2024<\/td><td class=\"column-5\">Eagle-Zip 750 Al-Zinc = 19.000 m\u00b2<br \/>\nEagle Trim PP Al-Zinc = 7.000 m\u00b2<\/td><td class=\"column-6\">Roll on Site<\/td>\n<\/tr>\n<tr class=\"row-96\">\n\t<td class=\"column-1\">95<\/td><td class=\"column-2\">MMKI Warehouse Expansion<br \/>\nGIIC - Cikarang<\/td><td class=\"column-3\">PT. Taisei-Pulauintan Construction International<\/td><td class=\"column-4\">July 2024<\/td><td class=\"column-5\">Eagle-Zip 420 Al-Zinc = 5.000 m\u00b2<br \/>\nEagle Trim Al-Zinc = 2.000 m\u00b2<\/td><td class=\"column-6\">Roll on Site<\/td>\n<\/tr>\n<tr class=\"row-97\">\n\t<td class=\"column-1\">96<\/td><td class=\"column-2\">Schutz New Warehouse<br \/>\nKIIC Karawang<\/td><td class=\"column-3\">PT. INDONAKANO<\/td><td class=\"column-4\">August 2024<\/td><td class=\"column-5\">Eagle-Zip 750 PP Al-Zinc = 7.000 m\u00b2<br \/>\nEagle Trim PP Al-Zinc = 17.000 m\u00b2<\/td><td class=\"column-6\">Roll on Site<\/td>\n<\/tr>\n<tr class=\"row-98\">\n\t<td class=\"column-1\">97<\/td><td class=\"column-2\">Hitachi Astemo (Building B) - Jababeka Cikarang<\/td><td class=\"column-3\">PT. INDONAKANO<\/td><td class=\"column-4\">September 2024<\/td><td class=\"column-5\">Eagle-Zip 750 Al-Zinc = 5.000 m\u00b2<\/td><td class=\"column-6\">Roll on Site<\/td>\n<\/tr>\n<tr class=\"row-99\">\n\t<td class=\"column-1\">98<\/td><td class=\"column-2\">SMII Packaging Warehouse - Pulogadung Jakarta<\/td><td class=\"column-3\">PT. INDONAKANO<\/td><td class=\"column-4\">September 2024<\/td><td class=\"column-5\">Eagle-Zip 750 Al-Zinc = 5.000 m\u00b2<br \/>\nEagle Trim PP Al-Zinc = 5.000 m\u00b2<\/td><td class=\"column-6\">Roll on Site<\/td>\n<\/tr>\n<tr class=\"row-100\">\n\t<td class=\"column-1\">99<\/td><td class=\"column-2\">Katsushiro Indonesia - Jababeka Cikarang<\/td><td class=\"column-3\">PT. SMCC Utama Indonesia<\/td><td class=\"column-4\">October 2024<\/td><td class=\"column-5\">Eagle Clip 600-BL Al-Zinc = 5.000 m\u00b2<\/td><td class=\"column-6\">Roll on Site<\/td>\n<\/tr>\n<tr class=\"row-101\">\n\t<td class=\"column-1\">100<\/td><td class=\"column-2\">Minda Asean Automotive - KIIC - Karawang<\/td><td class=\"column-3\">PT. INDONAKANO<\/td><td class=\"column-4\">January 2025<\/td><td class=\"column-5\">Eagle-Zip 750 Al-Zinc = 12.000 m\u00b2<br \/>\nEagle Trim PP Al-Zinc = 9.000 m\u00b2<\/td><td class=\"column-6\">Roll on Site<\/td>\n<\/tr>\n<tr class=\"row-102\">\n\t<td class=\"column-1\">101<\/td><td class=\"column-2\">Heinz ABC Warehouse - Walahar Karawang<\/td><td class=\"column-3\">PT. INDONAKANO<\/td><td class=\"column-4\">June 2025<\/td><td class=\"column-5\">Eagle-Zip 750 Al-Zinc = 9.000 m\u00b2<br \/>\nEagle Trim PP Al-Zinc = 6.000 m\u00b2<\/td><td class=\"column-6\">Roll on Site<\/td>\n<\/tr>\n<tr class=\"row-103\">\n\t<td class=\"column-1\">102<\/td><td class=\"column-2\">ESR KLP 1 Phase-2 - Suryacipta Karawang<\/td><td class=\"column-3\">PT. INDONAKANO<\/td><td class=\"column-4\">July 2025<\/td><td class=\"column-5\">Eagle-Zip 750 Al-Zinc = 13.500 m\u00b2<br \/>\nEagle Trim Al-Zinc = 6.500 m\u00b2<\/td><td class=\"column-6\">Roll on Site<\/td>\n<\/tr>\n<tr class=\"row-104\">\n\t<td class=\"column-1\">103<\/td><td class=\"column-2\">ASTEMO Manufacturing - Jababeka Cikarang<\/td><td class=\"column-3\">PT. INDONAKANO<\/td><td class=\"column-4\">August 2025<\/td><td class=\"column-5\">Eagle-Zip 750 Al-Zinc = 7.500 m\u00b2<\/td><td class=\"column-6\">Roll on Site<\/td>\n<\/tr>\n<tr class=\"row-105\">\n\t<td class=\"column-1\">104<\/td><td class=\"column-2\">NKI Bukit New Warehouse - Bukit Indah Cikampek<\/td><td class=\"column-3\">PT. SMCC Utama Indonesia<\/td><td class=\"column-4\">August 2025<\/td><td class=\"column-5\">Eagle-Zip 750 Al-Zinc = 11.500 m\u00b2<br \/>\nEagle Trim Al-Zinc = 8.500 m\u00b2<\/td><td class=\"column-6\">Roll on Site<\/td>\n<\/tr>\n<tr class=\"row-106\">\n\t<td class=\"column-1\">105<\/td><td class=\"column-2\">Komatsu Indonesia - MM2100 Cibitung<\/td><td class=\"column-3\">PT. SMCC Utama Indonesia<\/td><td class=\"column-4\">August 2025<\/td><td class=\"column-5\">Eagle Clip 600-BL Al-Zinc = 11.500 m\u00b2<br \/>\nEagle Trim PP Al-Zinc = 5.500 m\u00b2<\/td><td class=\"column-6\">Roll on Site<\/td>\n<\/tr>\n<tr class=\"row-107\">\n\t<td class=\"column-1\">106<\/td><td class=\"column-2\">Nissin Foods WH Extension - Jababeka Cikarang<\/td><td class=\"column-3\">PT. INDONAKANO<\/td><td class=\"column-4\">September 2025<\/td><td class=\"column-5\">Eagle-Zip 750 Al-Zinc = 4.500 m\u00b2<br \/>\nEagle Trim PP Al-Zinc = 3.500 m\u00b2<\/td><td class=\"column-6\">Roll on Site<\/td>\n<\/tr>\n<tr class=\"row-108\">\n\t<td class=\"column-1\">107<\/td><td class=\"column-2\">KTB Spareparts Center - MM2100 Cibitung<\/td><td class=\"column-3\">PT. INDONAKANO<\/td><td class=\"column-4\">PT. INDONAKANO<\/td><td class=\"column-5\">Eagle-Zip 420 Al-Zinc = 6.000 m\u00b2<br \/>\nEagle Trim PP Al-Zinc = 2.000 m\u00b2<\/td><td class=\"column-6\">Roll on Site<\/td>\n<\/tr>\n<tr class=\"row-109\">\n\t<td class=\"column-1\">108<\/td><td class=\"column-2\">MMKI Body WH Expansion 2 - GIIC - Cikarang<\/td><td class=\"column-3\">PT. Taisei-Pulauintan Construction International<\/td><td class=\"column-4\">September 2025<\/td><td class=\"column-5\">Eagle-Zip 420 Al-Zinc = 5.000 m\u00b2<br \/>\nEagle Trim PP Al-Zinc = 2.000 m\u00b2<\/td><td class=\"column-6\">Roll on Site<\/td>\n<\/tr>\n<tr class=\"row-110\">\n\t<td class=\"column-1\">109<\/td><td class=\"column-2\">Prochiz New Factory - Rancaekek Bandung<\/td><td class=\"column-3\">PT. Shimizu Bangun Cipta Kontraktor<\/td><td class=\"column-4\">September 2025<\/td><td class=\"column-5\">Eagle-Zip 750 PP Al-Zinc = 15.000 m\u00b2<br \/>\nEagle Trim PP Al-Zinc = 7.000 m\u00b2<\/td><td class=\"column-6\">Roll on Site<\/td>\n<\/tr>\n<tr class=\"row-111\">\n\t<td class=\"column-1\">110<\/td><td class=\"column-2\">Givaudan Indonesia Kartini - GIIC - Cikarang<\/td><td class=\"column-3\">PT. INDONAKANO<\/td><td class=\"column-4\">October 2025<\/td><td class=\"column-5\">Eagle Clip 669 Al-Zinc = 11.000 m\u00b2<br \/>\nEagle Trim PP Al-Zinc = 8.500 m\u00b2<\/td><td class=\"column-6\">Roll on Site<\/td>\n<\/tr>\n<tr class=\"row-112\">\n\t<td class=\"column-1\">111<\/td><td class=\"column-2\">Lavatextiles New Warehouse<br \/>\nCiteureup Bogor<\/td><td class=\"column-3\">PT. INDONAKANO<\/td><td class=\"column-4\">December 2025<\/td><td class=\"column-5\">Eagle-Zip 750 Al-Zinc = 3.500 m\u00b2<br \/>\nEagle Trim PP Al-Zinc = 3.500 m\u00b2<\/td><td class=\"column-6\">Roll on Site<\/td>\n<\/tr>\n<tr class=\"row-113\">\n\t<td class=\"column-1\">112<\/td><td class=\"column-2\">Hiruta Factory Extension<br \/>\nKIIC Karawang<\/td><td class=\"column-3\">PT. INDONAKANO<\/td><td class=\"column-4\">May 2026<\/td><td class=\"column-5\">Eagle-Zip 750 Al-Zinc = 6.000 m\u00b2<br \/>\nEagle Trim PP Al-Zinc = 4.000 m\u00b2<\/td><td class=\"column-6\">Roll on Site<\/td>\n<\/tr>\n<tr class=\"row-114\">\n\t<td class=\"column-1\">113<\/td><td class=\"column-2\">Astemo Manufacturing<br \/>\nJababeka Cikarang<\/td><td class=\"column-3\">PT. INDONAKANO<\/td><td class=\"column-4\">October 2026<\/td><td class=\"column-5\">Eagle-Zip 750 Al-Zinc = 8.000 m\u00b2<\/td><td class=\"column-6\">Roll on Site<\/td>\n<\/tr>\n<tr class=\"row-115\">\n\t<td class=\"column-1\">114<\/td><td class=\"column-2\">ESR KLP 2<br \/>\nSuryacipta Karawang<\/td><td class=\"column-3\">PT. Takenaka Indonesia<\/td><td class=\"column-4\">November 2026<\/td><td class=\"column-5\">Eagle-Zip 750 Al-Zinc = 61.500 m\u00b2<br \/>\nEagle Trim Al-Zinc = 23.500 m\u00b2<\/td><td class=\"column-6\">Roll on Site<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n\n","protected":false},"excerpt":{"rendered":"<p>NoName of Project &amp; Location Main Contractor PriodType Of Roof\/Siding &amp; VolumeRemark 1Iseki New Factory Pier &#8211; PasuruanPT. INDONAKANOApril 2013Eagle-ZIP 420 Al-Zinc = 22.000 m2 Eagle Trim PP Al-Zinc = 2.000 m2Roll on Site 2Seiren New Fa ctory JABABEKA VI &#8211; Cikarang PT. INDONAKANO May 2013 Eagle-Zip 420 Al-Zinc = 15.000 m2 Eagle Trim PP&hellip;<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"class_list":["post-547","page","type-page","status-publish","hentry","description-off"],"_links":{"self":[{"href":"https:\/\/www.eagleroofindonesia.com\/en\/wp-json\/wp\/v2\/pages\/547","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.eagleroofindonesia.com\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.eagleroofindonesia.com\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.eagleroofindonesia.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.eagleroofindonesia.com\/en\/wp-json\/wp\/v2\/comments?post=547"}],"version-history":[{"count":1,"href":"https:\/\/www.eagleroofindonesia.com\/en\/wp-json\/wp\/v2\/pages\/547\/revisions"}],"predecessor-version":[{"id":548,"href":"https:\/\/www.eagleroofindonesia.com\/en\/wp-json\/wp\/v2\/pages\/547\/revisions\/548"}],"wp:attachment":[{"href":"https:\/\/www.eagleroofindonesia.com\/en\/wp-json\/wp\/v2\/media?parent=547"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}